Unit information
- Unit code
- PMQ605
- Faculty
- Faculty of Engineering
- School/Discipline
- School of Architecture and Built Environment
- Study area
- Engineering
- Credit points
- 12
Dates and locations
Teaching period | Dates | Locations |
---|---|---|
Teaching Session 2, 2024 | 22 April 2024 - 28 June 2024 | QUT Online (Online) |
Session 4, 2024 | 8 October 2024 - 13 December 2024 | QUT Online (Online) |
Fees
- Domestic fee-paying student fee
- 2024: $3,312
- International student fee (excluding study abroad students)
- 2024: $4,620
Guide to fees
Previous study requirements
- Equivalents
- PMN605
- Assumed knowledge
- PMN501, PMN502, PMN503 and PMN504 are assumed knowledge
Guide to previous study requirements
[object Object]
{"attributes":{"OESUNT":"Available for Single Unit students - OES online unit"},"study-types":[],"availabilities":[{"study-mode":"All","attendance-mode":"Online","location":"Online","campus":"QUT Online","study-period":"Teaching Session 2","date-end":"2024-06-27T14:00Z","date-start":"2024-04-21T14:00Z","year":2024},{"study-mode":"All","attendance-mode":"Online","location":"Online","campus":"QUT Online","study-period":"Session 4","date-end":"2024-12-12T14:00Z","date-start":"2024-10-07T14:00Z","year":2024}],"broad-study-area":{"name":"Engineering","foe":80315},"code":"PMQ605","credit-points":12,"fees":[{"dom":"$3,312","int":"$4,620","year":2024}],"faculty":{"code":470100,"title-short":"Faculty of Engineeri","title-full":"Faculty of Engineering"},"school-discipline":{"code":470400,"title-short":"Arch & Built Env","title-full":"School of Architecture and Built Environment"},"unit-requisites":{"assumed":"PMN501, PMN502, PMN503 and PMN504 are assumed knowledge","equiv":"PMN605"},"sams-version":1,"summer":[],"synopsis":"This unit identifies the optimal procurement strategy for a project. It takes a strategic approach and positions procurement in the project lifecycle. It also provides the detail required to be an effective client or tenderer for projects. A broader range of procurement strategies and contract forms are now available to the market and clients and providers need to understand the risk profiles of each of them before entering into such contracts. The tools and techniques required are not the same for every contract and so both clients and providers must be prepared with both systems and suitably qualified people. It builds on a sound understanding of projects and the project lifecycle and informs the project risk assessment and risk allocation for the project.","title-full":"PMQ605 Strategic Project Procurement","title-short":"Strategic Project Procurement","url":{"current":"https://qutvirtual4.qut.edu.au/group/student/enrolment/units/unit?unitCode=PMQ605&year=2024","prospective":"https://www.qut.edu.au/study/unit?unitCode=PMQ605","timetable":"https://qutvirtual3.qut.edu.au/qvpublic/ttab_unit_search_p.process_teach_period_search?p_unit_cd=PMQ605"},"year":2024,"years":[2024]}
Unit outlines
Loading unit outlines...
Offer of some units is subject to viability, and information in these Unit Outlines is subject to change prior to commencement of the teaching period.