Unit information
- Unit code
- ABB222
- Faculty
- Faculty of Engineering
- School/Discipline
- School of Architecture and Built Environment
- Study area
- Engineering
- Credit points
- 12
Dates and locations
Teaching period | Dates | Locations |
---|---|---|
Semester 2, 2025 | 21 July 2025 - 15 November 2025 | Gardens Point |
Fees
- Commonwealth supported place (CSP) student contribution amount
- 2025: $1,164
- Domestic fee-paying student fee
- 2025: $4,356
- International student fee (excluding study abroad students)
- 2025: $4,896
Guide to fees
Previous study requirements
- Prerequisites
- ABB122 or UXB113 or UDB113 or EGB273
- Anti-requisites
- UDB213, UXB214
- Equivalents
- UXH315
Guide to previous study requirements
[object Object]
{"attributes":{"DGCIF":"Available for cross institutional students - faculty approval required","DGNAF":"Available for Single Unit students (UG) - faculty approval required"},"study-types":["Cross-institutional study","Single-unit study"],"availabilities":[{"study-mode":"All","attendance-mode":"Internal","location":"Gardens Point","campus":"Gardens Point","study-period":"Semester 2","date-end":"2025-11-14T14:00Z","date-start":"2025-07-20T14:00Z","year":2025}],"broad-study-area":{"name":"Engineering","foe":40303},"code":"ABB222","credit-points":12,"fees":[{"csp":"$1,164","dom":"$4,356","int":"$4,896","year":2025}],"faculty":{"code":470100,"title-short":"Faculty of Engineeri","title-full":"Faculty of Engineering"},"school-discipline":{"code":470400,"title-short":"Arch & Built Env","title-full":"School of Architecture and Built Environment"},"unit-requisites":{"anti":"UDB213, UXB214","equiv":"UXH315","pre":"ABB122 or UXB113 or UDB113 or \nEGB273"},"sams-version":1,"summer":[],"synopsis":"An advanced construction management unit focusing on construction cost quantification techniques linking to previous years’ basic work and understanding. It includes an introduction to the interrelationship between professions in estimating and the techniques available to quantify cost; definition of the fundamental elements of cost and the methods of evaluating labour, materials, and equipment; assessing base estimates for major trades; assessment of offers from sub-contractors and implications for the tendering process; first principles estimating; review of an estimate; subsequent negotiations and application of estimating to variations and profit monitoring; outcome performance indicators; and introduction to current industry practice, tools, and technology.","title-full":"ABB222 Construction Estimating","title-short":"Construction Estimating","url":{"current":"https://qutvirtual4.qut.edu.au/group/student/enrolment/units/unit?unitCode=ABB222&year=2025","prospective":"https://www.qut.edu.au/study/unit?unitCode=ABB222","timetable":"https://qutvirtual3.qut.edu.au/qvpublic/ttab_unit_search_p.process_teach_period_search?p_unit_cd=ABB222"},"year":2025,"years":[2025]}
Unit outlines
Loading unit outlines...
Offer of some units is subject to viability, and information in these Unit Outlines is subject to change prior to commencement of the teaching period.